Non-binding host commitment

The fastest new capacity is already standing.

A new data center campus waits years for land, permits and electrical service. Your building already has all three, so capacity on its surfaces can go live in months, not years. This is a non-binding commitment to host ROSE panels on a surface your building is not using today, once units are available. Silicon agnostic: any accelerator, any building. Two minutes, and you can stop at any point afterwards for any reason.

No capital from you
No equipment on site now
No change to operations
You can walk away
ROSE Building intelligence Host screening readout
Surface you controlRooftop, parking deck or canopy, blank facade, vacant floor, yard. If it has structure and power, it can earn.
The deciding numberMeasured electrical service headroom: the service your building already has, less its measured peak, less design margin.
Why the clock is shortThe building is standing and the service is in. What a greenfield site waits years for, your building already cleared.
SiliconAny accelerator, any building. ROSE is silicon agnostic, so the panel field outlives any one chip generation.
Your commitmentNon-binding, no capital, nothing on site now. Either side can stop at any time, for any reason.

Scroll to the two minute form

Property
Power
Terms

Which building, and who are you to it?

The address is the only thing we genuinely need here. Everything else makes the screening faster.

Start typing and pick your address if it appears. If it does not, just type it, we will confirm it with you.
Please give us the street address of the building.
A guess is fine. Area is not what decides capacity.
A commitment can come from an owner, or from a tenant who controls its own space. If you manage or represent, we will loop the owner in with you.

How much spare electrical service does it have?

This is the number that decides everything, and almost nobody knows it off the top of their head. Pick whichever of these costs you the least effort. Any of them is enough to start.

In kilowatts. A range or a rough figure is fine.

A label tells us what the service is rated for. What we can actually use is that figure less your measured peak, less design margin, less whatever you want held back for your own growth. So this is a starting point, never the answer.

Nothing to fill in. Leave us the building and we will do the rest. Most owners are here, and a building with no spare service is still not a decline: we would screen storage or on site generation with storage instead.

Tap to add a utility bill, a load study or a photo of the panel
PDF, JPG, PNG or HEIC. Up to 3 files, 6 MB each. Photos are shrunk on your device before they are sent.
    One of those files could not be used. Remove it and try another.

    The terms, then your signature.

    Read them. They are short, and they are non-binding on both of us.

    We need your name.
    That email does not look right. Check it, it is where everything goes.

    ROSE Host Commitment, Non-Binding Terms

    Typing your name is your signature under the federal E-SIGN Act and the Texas UETA.
    Please type your full legal name.

    Your building is on the list.

    We have your commitment and we have started screening. Your receipt is:

    RHC
    Check your email now, including spam and promotions. We have just sent a confirmation to your address. It has one button in it. Clicking that button is how we know the email reached you, and it is what opens your private deal room. If it is not in your inbox in a few minutes it is in spam: mark it not spam and add bill@bdsrvs.com to your contacts, or the site brief will go the same way.

    Questions before you sign? hello@rosepanel.io. Not ready to commit a building but want the numbers? Run the capacity estimator.